We started this morning, rather late, but it was before noon! Seems the paper backing on the floor was a bit easier to scrape today. By 1:30 P.M. we were setting the first vinyl tile in place. We just completed a basic rectangle and will fill the edges tomorrow. We will have pictures of the floor pre-vinyl on Blue Road Blogger later this evening.
And about the truck. Eliminated the fuel solenoid shut-off as a problem as I wired the solenoid in the on position and the #9 engine fuse still blows. It could be the fuel heater as it is on the #9 curcuit. Looks like we will have the manual fuel cut off cable tomorrow. Then I will be able to get it to the transmission shop for a rebuild. Wouldn't it be great if it was the transmission and the rebuild fixed the problem?
No comments:
Post a Comment